![]() |
![]() |
|
Data Center Solutions - Call PBM IT Solutions at (888) 233-6471Multiple systems, such as inventory control, credit card processing, accounting and much more will be involved in a complex process such as eCommerce checkout. A failure in one will compromise all the others. A data center is the best environment for these complicated IT functions. Approximately half of the power consumed by a data center is required for cooling. As heat load increases, more floor space must be reserved for cooling equipment. Without high ceilings (20 feet or more), the hot exhaust air of servers is likely to become in-take air for servers mounted in the upper portion of a cabinet. There are 10 key issues for IT managers to keep up with: virtualization; the data deluge; energy and green IT; complex resource tracking; consumerization of IT and social software; unified communications; mobile and wireless; system density; mashups and portals; and cloud computing. Operating a Data Center not only requires a comprehensive skill set, but also a little forethought into the overall industry landscape. Virtual machines offer many benefits: server consolidation, increased utilization and faster recovery times after failure. Hypervisor software is the secret sauce that makes virtualization possible. This software, also known as a virtualization manager, sits between the hardware and the operating system, and decouples the operating system and applications from the hardware. The hypervisor assigns the amount of access that the operating systems and applications have with the processor and other hardware resources, such as memory and disk input/output. Many IT departments encourage users to save critical data to available network servers under the control of enterprise software. This policy, in most cases, is not successful, since users store data locally, especially mobile users who are seldom connected to a network. The Cisco Unified Computing System creates a highly dynamic and cohesive integration with network and storage resources to meet the rapidly changing needs in today's data centers. The Green IT approach can include several different phases in the lifecycle of a product – the development, production, usage and disposal of IT. Development must grant consideration to the environment; the production must take place using environmentally friendly production methods; the IT solutions must be used in an environmentally friendly manner; and finally, IT waste must be disposed of in an environmentally correct manner. All of these phases are supported by research and innovation in Green IT. An effective High Availability (HA) data solution must address both unplanned and planned causes of downtime to achieve a truly fault tolerant and resilient IT infrastructure. Unplanned downtime is primarily the result of computer failures, data failures and human error. Planned downtime is primarily due to data changes or system changes that must be applied to the production system. The Cisco Nexus 1000V allows policy to move with a virtual machine during live migration ensuring persistent network, security, and storage compliance resulting in improved business continuance, performance management, and security compliance. |